Lode Gold unveils accelerated drill strategy for its Fremont Gold Project in California, targeting PFS by 2027 and FS by 2029 to fast-track the bulk undergroundLode Gold unveils accelerated drill strategy for its Fremont Gold Project in California, targeting PFS by 2027 and FS by 2029 to fast-track the bulk underground

Lode Gold Accelerates Fremont Gold Project Development with Aggressive Drilling Program

2026/04/16 01:30
3 min read
For feedback or concerns regarding this content, please contact us at crypto.news@mexc.com

Lode Gold Resources Inc. announced an accelerated exploration and development strategy at its Fremont Gold Project in Mariposa County, California. The company plans to fast-track the project toward a Preliminary Feasibility Study with 3,500 meters of drilling in 2026, followed by a Feasibility Study with 7,800 meters of drilling in 2028.

The revised development approach focuses on bulk underground mining, supported by a growing Mineral Resource Estimate and strong geological continuity along the Mother Lode structural corridor. The 2026 drilling program includes 1,400 meters of metallurgical and geotechnical drilling, 600 meters of hydrological and infill drilling in the Pine Tree-Josephine area, and 1,500 meters of step-out exploration drilling in the Chicken Gulch area.

Jon Hill, Technical Committee Chair and Director, stated that Fremont has demonstrated mineralization characteristics ideally suited for bulk underground mining, with significant mineralization widths and excellent grade continuity contributing to an exceptional mineral resource inventory. The company has defined approximately 3 million ounces to date over just an 800-meter strike segment of a broader 4-kilometer mineralized trend.

The planned drilling aims to test extensions of mineralization along the central structural corridor, where only about 20% of the first 500 meters of strike length is currently included in the existing Mineral Resource Estimate. The company is targeting completion of the Preliminary Feasibility Study by the second quarter of 2027.

Bill Fisher of the Technical Advisory Board noted that few projects can realistically advance to a Pre-Feasibility Study within a 15-month timeframe. Fremont benefits from an extensive historical database, strong geological continuity, and an easily upgradable resource base that allows for accelerated technical work.

Following the Preliminary Feasibility Study, the company plans an additional 7,800-meter underground drilling program as part of the Feasibility Study stage. This program will be conducted from two parallel exploration ramps, each approximately 2,200 meters in length, developed along the mineralized body. These ramps will provide direct underground access for drilling and are expected to be incorporated into future mining operations.

Wendy T. Chan, CEO and Director of Lode Gold, commented that the company is implementing a clear and disciplined strategy to fast-track Fremont from resource definition through feasibility and ultimately development. The drilling programs are designed to support both the Preliminary Feasibility Study and position the project for a seamless transition into the Feasibility Study stage and future mine development.

Advancing Fremont through these studies represents a key step in unlocking the project’s full value. The last time Fremont reached a comparable level of technical advancement was in 1986 under a different development concept. The current strategy reflects improved geological understanding and favorable market conditions, positioning the project for modern development. The project sits on more than 3,000 acres of 100% owned private and patented land designated as an Opportunity Zone with special tax incentives.

Blockchain Registration, Verification & Enhancement provided by NewsRamp™

This news story relied on content distributed by NewMediaWire. Blockchain Registration, Verification & Enhancement provided by NewsRamp™. The source URL for this press release is Lode Gold Accelerates Fremont Gold Project Development with Aggressive Drilling Program.

The post Lode Gold Accelerates Fremont Gold Project Development with Aggressive Drilling Program appeared first on citybuzz.

Disclaimer: The articles reposted on this site are sourced from public platforms and are provided for informational purposes only. They do not necessarily reflect the views of MEXC. All rights remain with the original authors. If you believe any content infringes on third-party rights, please contact crypto.news@mexc.com for removal. MEXC makes no guarantees regarding the accuracy, completeness, or timeliness of the content and is not responsible for any actions taken based on the information provided. The content does not constitute financial, legal, or other professional advice, nor should it be considered a recommendation or endorsement by MEXC.
Tags:

USD1 Genesis: 0 Fees + 12% APR

USD1 Genesis: 0 Fees + 12% APRUSD1 Genesis: 0 Fees + 12% APR

New users: stake for up to 600% APR. Limited time!