MIAMI, Dec. 17, 2025 /PRNewswire/ — Hut 8 Corp. (Nasdaq, TSX: HUT) (“Hut 8” or the “Company”), an energy infrastructure platform integrating power, digital infrastructureMIAMI, Dec. 17, 2025 /PRNewswire/ — Hut 8 Corp. (Nasdaq, TSX: HUT) (“Hut 8” or the “Company”), an energy infrastructure platform integrating power, digital infrastructure

Hut 8 Announces AI Infrastructure Partnership with Anthropic and Fluidstack

MIAMI, Dec. 17, 2025 /PRNewswire/ — Hut 8 Corp. (Nasdaq, TSX: HUT) (“Hut 8” or the “Company”), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive use cases, today announced a partnership with Anthropic and Fluidstack to accelerate the deployment of hyperscale AI infrastructure in the United States. As part of the partnership, Hut 8 will develop and deliver at least 245 megawatts (MW) and up to 2,295 MW of AI data center infrastructure for Anthropic, leveraging high-performance clusters operated by Fluidstack.

The partnership is structured across several tranches that together establish a path to deploy at least 245 MW and up to 2,295 MW of utility capacity:

  • Tranche 1: The partnership will launch at the Company’s River Bend campus (“River Bend”) in Louisiana, where Hut 8 and Fluidstack will develop an initial 245 MW of IT capacity, supported by 330 MW of utility capacity.
  • Tranche 2: Hut 8 grants the tenant a Right of First Offer (ROFO) for up to 1,000 MW of additional IT capacity at River Bend, subject to the expansion of power at the site.
  • Tranche 3: As part of a strategic partnership, Hut 8 and Anthropic may jointly diligence and develop up to 1,050 MW of additional optional capacity to scale across Hut 8’s development pipeline beyond River Bend.

Asher Genoot, CEO of Hut 8, said: “Scaling frontier AI infrastructure is, at its core, a power challenge. Hut 8’s power-first, innovation-driven development model enables us to originate and develop greenfield data center sites at the pace and scale required by leading model developers. Through our partnership with Anthropic and Fluidstack, we are aligning power, data center design, and compute deployment into an integrated platform capable of delivering at gigawatt scale.”

James Bradbury, Head of Compute at Anthropic, said: “This partnership is an expansion of our existing work with Fluidstack and marks a new opportunity to collaborate with Hut 8 to bring additional capacity online by early 2027. Hut 8’s ability to source and deliver infrastructure at scale provides the runway necessary to continue advancing the capabilities of our models.”

Gary Wu, Co-founder and CEO of Fluidstack, said: “Fluidstack was built to solve compute challenges at scale, across every level of complexity. As Anthropic pushes the frontier of AI, we’re proud to work alongside partners such as Hut 8 to design, deploy, and operate the foundational infrastructure that leading labs rely on to win.”

Conference Call

The Company will host a conference call on Wednesday, December 17, 2025 at 12:00 p.m. ET to discuss the partnership. Investors can join the live webcast at https://hut8.zoom.us/webinar/register/WN_FY30DzemQ3C4cS9Cw_TFQA.

Additional Partnership Information and Upcoming Communications

Hut 8 has made available on its website an investor presentation with further details regarding the partnership.

For important news and information regarding the Company, including investor presentations and timing of future investor conferences, visit the Investor Relations section of the Company’s website, hut8.com/investors, and its social media accounts, including on X and LinkedIn. The Company uses its website and social media accounts as primary channels for disclosing key information to its investors, some of which may contain material and previously non-public information.

About Hut 8

Hut 8 Corp. is an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive use cases. We take a power-first, innovation-driven approach to developing, commercializing, and operating the critical infrastructure that underpins the breakthrough technologies of today and tomorrow. Our platform spans 1,020 megawatts of Energy Capacity Under Management, 330 megawatts of Energy Capacity Under Construction, and 1,230 megawatts of Energy Capacity Under Development, and across 19 sites in the United States and Canada: five Bitcoin mining, hosting, and Managed Services sites in Alberta, New York, and Texas; five high performance computing data centers in British Columbia and Ontario; four power generation assets in Ontario; one non-operational site in Alberta; three sites under development in Texas and Illinois; and one site under construction in Louisiana. For more information, visit hut8.com and follow us on X at @Hut8Corp.

Cautionary Note Regarding Forward-Looking Information

This press release includes “forward-looking information” and “forward-looking statements” within the meaning of Canadian securities laws and United States securities laws, respectively (collectively, “forward-looking information”). All information, other than statements of historical facts, included in this press release that address activities, events, or developments that Hut 8 expects or anticipates will or may occur in the future, including statements relating to the Company’s partnership with Anthropic and Fluidstack, including the Company’s ability to deliver and deploy at least 245 MW at its River Bend campus up to 2,295 MW of AI data center infrastructure across its evolving pipeline, the Company’s ability to expand power at its River Bend site, the Company’s ability to expand, source, diligence, design, develop, deliver, and operate sites within its development pipeline, the Company’s plan to bring capacity online by early 2027 at the River Bend site, and the Company’s future business strategy, competitive strengths, expansion, and growth of the business and operations more generally, and other such matters is forward-looking information. Forward-looking information is often identified by the words “may”, “would”, “could”, “should”, “will”, “intend”, “plan”, “anticipate”, “allow”, “believe”, “estimate”, “expect”, “predict”, “can”, “might”, “potential”, “predict”, “is designed to”, “likely,” or similar expressions.

Statements containing forward-looking information are not historical facts, but instead represent management’s expectations, estimates, and projections regarding future events based on certain material factors and assumptions at the time the statement was made. While considered reasonable by Hut 8 as of the date of this press release, such statements are subject to known and unknown risks, uncertainties, assumptions and other factors that may cause the actual results, level of activity, performance, or achievements to be materially different from those expressed or implied by such forward-looking information, including, but not limited to, risks relating to the construction of new data centers, including cost overruns, delays, supply chain issues, permitting or regulatory hurdles, unexpected technical challenges, and dependency on contractors; risks relating to the financing of new data centers, including the potential dilutive impact of equity issuances (if any), access to capital markets, timing and cost of financing, and market conditions such as increases in interest rates, declining equity valuations, volatility in credit markets, or tightening lending standards; failure of critical systems; geopolitical, social, economic, and other events and circumstances; competition from current and future competitors; risks related to power requirements; cybersecurity threats and breaches; hazards and operational risks; changes in leasing arrangements; Internet-related disruptions; dependence on key personnel; having a limited operating history; attracting and retaining customers; entering into new offerings or lines of business; price fluctuations and rapidly changing technologies; predicting facility requirements; strategic alliances or joint ventures; operating and expanding internationally; failing to grow hashrate; purchasing miners; relying on third-party mining pool service providers; uncertainty in the development and acceptance of the Bitcoin network; Bitcoin halving events; competition from other methods of investing in Bitcoin; concentration of Bitcoin holdings; hedging transactions; potential liquidity constraints; legal, regulatory, governmental, and technological uncertainties; physical risks related to climate change; involvement in legal proceedings; trading volatility; and other risks described from time to time in Company’s filings with the U.S. Securities and Exchange Commission. In particular, see the Company’s recent and upcoming annual and quarterly reports and other continuous disclosure documents, which are available under the Company’s EDGAR profile at sec.gov and SEDAR+ profile at sedarplus.ca.

Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/hut-8-announces-ai-infrastructure-partnership-with-anthropic-and-fluidstack-302644377.html

SOURCE Hut 8 Corp.

Market Opportunity
Sleepless AI Logo
Sleepless AI Price(AI)
$0.03525
$0.03525$0.03525
-4.13%
USD
Sleepless AI (AI) Live Price Chart
Disclaimer: The articles reposted on this site are sourced from public platforms and are provided for informational purposes only. They do not necessarily reflect the views of MEXC. All rights remain with the original authors. If you believe any content infringes on third-party rights, please contact service@support.mexc.com for removal. MEXC makes no guarantees regarding the accuracy, completeness, or timeliness of the content and is not responsible for any actions taken based on the information provided. The content does not constitute financial, legal, or other professional advice, nor should it be considered a recommendation or endorsement by MEXC.

You May Also Like

Japan-Based Bitcoin Treasury Company Metaplanet Completes $1.4 Billion IPO! Will It Buy Bitcoin? Here Are the Details

Japan-Based Bitcoin Treasury Company Metaplanet Completes $1.4 Billion IPO! Will It Buy Bitcoin? Here Are the Details

The post Japan-Based Bitcoin Treasury Company Metaplanet Completes $1.4 Billion IPO! Will It Buy Bitcoin? Here Are the Details appeared on BitcoinEthereumNews.com. Japan-based Bitcoin treasury company Metaplanet announced today that it has successfully completed its public offering process. Metaplanet Grows Bitcoin Treasury with $1.4 Billion IPO The company’s CEO, Simon Gerovich, stated in a post on the X platform that a large number of institutional investors participated in the process. Among the investors, mutual funds, sovereign wealth funds, and hedge funds were notable. According to Gerovich, approximately 100 institutional investors participated in roadshows held prior to the IPO. Ultimately, over 70 investors participated in Metaplanet’s capital raising. Previously disclosed information indicated that the company had raised approximately $1.4 billion through the IPO. This funding will accelerate Metaplanet’s growth plans and, in particular, allow the company to increase its balance sheet Bitcoin holdings. Gerovich emphasized that this step will propel Metaplanet to its next stage of development and strengthen the company’s global Bitcoin strategy. Metaplanet has recently become one of the leading companies in Japan in promoting digital asset adoption. The company has previously stated that it views Bitcoin as a long-term store of value. This large-scale IPO is considered a significant step in not only strengthening Metaplanet’s capital but also consolidating Japan’s role in the global crypto finance market. *This is not investment advice. Follow our Telegram and Twitter account now for exclusive news, analytics and on-chain data! Source: https://en.bitcoinsistemi.com/japan-based-bitcoin-treasury-company-metaplanet-completes-1-4-billion-ipo-will-it-buy-bitcoin-here-are-the-details/
Share
BitcoinEthereumNews2025/09/18 08:42
CME Group to Launch Solana and XRP Futures Options

CME Group to Launch Solana and XRP Futures Options

The post CME Group to Launch Solana and XRP Futures Options appeared on BitcoinEthereumNews.com. An announcement was made by CME Group, the largest derivatives exchanger worldwide, revealed that it would introduce options for Solana and XRP futures. It is the latest addition to CME crypto derivatives as institutions and retail investors increase their demand for Solana and XRP. CME Expands Crypto Offerings With Solana and XRP Options Launch According to a press release, the launch is scheduled for October 13, 2025, pending regulatory approval. The new products will allow traders to access options on Solana, Micro Solana, XRP, and Micro XRP futures. Expiries will be offered on business days on a monthly, and quarterly basis to provide more flexibility to market players. CME Group said the contracts are designed to meet demand from institutions, hedge funds, and active retail traders. According to Giovanni Vicioso, the launch reflects high liquidity in Solana and XRP futures. Vicioso is the Global Head of Cryptocurrency Products for the CME Group. He noted that the new contracts will provide additional tools for risk management and exposure strategies. Recently, CME XRP futures registered record open interest amid ETF approval optimism, reinforcing confidence in contract demand. Cumberland, one of the leading liquidity providers, welcomed the development and said it highlights the shift beyond Bitcoin and Ethereum. FalconX, another trading firm, added that rising digital asset treasuries are increasing the need for hedging tools on alternative tokens like Solana and XRP. High Record Trading Volumes Demand Solana and XRP Futures Solana futures and XRP continue to gain popularity since their launch earlier this year. According to CME official records, many have bought and sold more than 540,000 Solana futures contracts since March. A value that amounts to over $22 billion dollars. Solana contracts hit a record 9,000 contracts in August, worth $437 million. Open interest also set a record at 12,500 contracts.…
Share
BitcoinEthereumNews2025/09/18 01:39
Why the Testing Method Developers Prefer Is Rarely Ever the One That Finds the Most Bugs

Why the Testing Method Developers Prefer Is Rarely Ever the One That Finds the Most Bugs

A replicated controlled study confirms that developers’ perceptions, preferences, and opinions about software testing techniques do not reliably predict actual
Share
Hackernoon2025/12/18 05:00