Advancing high-performance computing infrastructure in North America DALLAS, Jan. 8, 2026 /PRNewswire/ — Jacobs (NYSE: J) has been selected by Hut 8 (NASDAQ: HUTAdvancing high-performance computing infrastructure in North America DALLAS, Jan. 8, 2026 /PRNewswire/ — Jacobs (NYSE: J) has been selected by Hut 8 (NASDAQ: HUT

Jacobs Appointed Engineering, Procurement and Construction Management Lead for Hut 8 AI Data Center

2026/01/08 21:15
5분 읽기
이 콘텐츠에 대한 의견이나 우려 사항이 있으시면 crypto.news@mexc.com으로 연락주시기 바랍니다

Advancing high-performance computing infrastructure in North America

DALLAS, Jan. 8, 2026 /PRNewswire/ — Jacobs (NYSE: J) has been selected by Hut 8 (NASDAQ: HUT), an energy infrastructure platform, to deliver Engineering, Procurement and Construction Management (EPCM) services for its River Bend data center in Louisiana.

The data center is leased under a 15-year, $7.0 billion lease for 245 megawatts of IT capacity and anchors a larger planned campus that is poised to become one of the largest AI and high-performance computing developments in North America. The region’s power dense utility infrastructure enables reliable, high-quality delivery with the speed, flexibility and consistency required at this scale.

Jacobs Chair and CEO Bob Pragada said: “Jacobs brings decades of excellence, delivering complex advanced facilities and critical infrastructure for some of the world’s largest data center, semiconductor and life sciences clients. Our collaboration with Hut 8 reflects a shared commitment to setting a new benchmark for AI infrastructure – with safety, quality and disciplined delivery at the forefront.”

Hut 8 CEO Asher Genoot said: “Execution discipline is critical at the scale and complexity of River Bend. We believe Jacobs brings the experience and rigor required to deliver complex infrastructure on schedule and to the highest standards of quality and safety. Their role as EPCM partner reinforces a partnership-driven execution model designed to de-risk delivery and establish a repeatable framework as we scale across our broader development pipeline.”

The initial data hall at River Bend is scheduled for completion and commissioning in Q1 2027, with additional data halls scheduled to come online over the balance of 2027.

Jacobs delivers high value, advanced manufacturing for data centers, semiconductors and life sciences – including the recent $3.2B end-to-end cell culture facility, the largest of its kind in North America. This award further expands our data center portfolio where we’re providing EPCM services for a confidential high performance computing facility in the Southeastern U.S., delivering quantum computing programs for PsiQuantum in Chicago and Brisbane, and advancing AI ready infrastructure through NVIDIA’s Omniverse Blueprint for AI factory digital twins. At Start Campus’s SINES DC Campus in Portugal, we are delivering a 1.2-gigawatt AI scale data center powered entirely by renewable energy and cooled with a zero-water system, underscoring Jacobs’ ability to support the next generation of sustainable, high density compute environments.

At Jacobs, we’re challenging today to reinvent tomorrow – delivering outcomes and solutions for the world’s most complex challenges. With approximately $12 billion in annual revenue and a talent force of almost 43,000, we provide end-to-end services in advanced manufacturing, cities & places, energy, environmental, life sciences, transportation and water. From advisory and consulting, feasibility, planning, design, program and lifecycle management, we’re creating a more connected and sustainable world. See how at jacobs.com and connect with us on LinkedIn, Instagram, X and Facebook. 

Certain statements contained in this press release constitute forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. Forward-looking statements are statements that do not directly relate to any historical or current fact. When used herein, words such as “expects,” “anticipates,” “believes,” “seeks,” “estimates,” “plans,” “intends,” “future,” “will,” “would,” “could,” “can,” “may,” and similar words are intended to identify forward-looking statements. We base these forward-looking statements on management’s current estimates and expectations, as well as currently available competitive, financial and economic data. Forward-looking statements, however, are inherently uncertain. There are a variety of factors that could cause business results to differ materially from our forward-looking statements including, but not limited to, uncertainties as to, the timing of the award of projects and funding and potential changes to the amounts provided for under the Infrastructure Investment and Jobs Act and other legislation and executive orders related to governmental spending, including any directive to federal agencies to reduce federal spending or the size of the federal workforce, and changes in U.S. or foreign tax laws, including the tax legislation enacted in the U.S. in July 2025, statutes, rules, regulations or ordinances, including the impact of, and changes to tariffs and retaliatory tariffs or trade policies, that may adversely impact our future financial positions or results of operations, as well as general economic conditions, including inflation and the actions taken by monetary authorities in response to inflation, changes in interest rates and foreign currency exchange rates, changes in capital markets, the possibility of a recession or economic downturn, and increased uncertainty and risks, including policy risks and potential civil unrest, relating to the outcome of elections across our key markets and elevated geopolitical tension and conflicts, among others. For a description of these and additional factors that may occur that could cause actual results to differ from our forward-looking statements, see our filings with the U.S. Securities and Exchange Commission. The company is not under any duty to update any of the forward-looking statements after the date of this press release to conform to actual results, except as required by applicable law.

For press/media inquiries:
media@jacobs.com  

Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/jacobs-appointed-engineering-procurement-and-construction-management-lead-for-hut-8-ai-data-center-302656050.html

SOURCE Jacobs

시장 기회
플러리싱 에이아이 로고
플러리싱 에이아이 가격(SLEEPLESSAI)
$0.01916
$0.01916$0.01916
+0.15%
USD
플러리싱 에이아이 (SLEEPLESSAI) 실시간 가격 차트
면책 조항: 본 사이트에 재게시된 글들은 공개 플랫폼에서 가져온 것으로 정보 제공 목적으로만 제공됩니다. 이는 반드시 MEXC의 견해를 반영하는 것은 아닙니다. 모든 권리는 원저자에게 있습니다. 제3자의 권리를 침해하는 콘텐츠가 있다고 판단될 경우, crypto.news@mexc.com으로 연락하여 삭제 요청을 해주시기 바랍니다. MEXC는 콘텐츠의 정확성, 완전성 또는 시의적절성에 대해 어떠한 보증도 하지 않으며, 제공된 정보에 기반하여 취해진 어떠한 조치에 대해서도 책임을 지지 않습니다. 본 콘텐츠는 금융, 법률 또는 기타 전문적인 조언을 구성하지 않으며, MEXC의 추천이나 보증으로 간주되어서는 안 됩니다.

USD1 Genesis: 0 Fees + 12% APR

USD1 Genesis: 0 Fees + 12% APRUSD1 Genesis: 0 Fees + 12% APR

New users: stake for up to 600% APR. Limited time!