Discussing the challenges of obtaining real-world data and details the two case studies—the Repo Margining System and the Abrahamsson Case Study—used for the model's validation.Discussing the challenges of obtaining real-world data and details the two case studies—the Repo Margining System and the Abrahamsson Case Study—used for the model's validation.

The Challenges of Data Collection for Software Engineering Research

2025/08/27 23:30
2분 읽기
이 콘텐츠에 대한 의견이나 우려 사항이 있으시면 crypto.news@mexc.com으로 연락주시기 바랍니다

Abstract and 1. Introduction

  1. Background and 2.1. Related Work

    2.2. The Impact of XP Practices on Software Productivity and Quality

    2.3. Bayesian Network Modelling

  2. Model Design

    3.1. Model Overview

    3.2. Team Velocity Model

    3.3. Defected Story Points Model

  3. Model Validation

    4.1. Experiments Setup

    4.2. Results and Discussion

  4. Conclusions and References

4.1. Experiments Setup

Collecting data from real projects to validate our model was a difficult task due to several reasons. Due to XP simplicity value, it is difficult to find company collecting information regarding their activities and practices. Moreover, most real XP projects are developed by private companies having restrictions on publishing their internal development process. In addition, there is no guarantee that the available data is sufficient for model validation.

\ Two XP projects provided enough data to test our model. The first one is the Repo Margining System project [4]. The second one is a controlled case study reported by Pekka Abrahamsson [17]. We will refer to this case study in the rest of this paper by Abrahamsson Case Study. The model input data for the two projects are shown in tables 2 and 3. The model internal parameters are summarized in table 4.

\ Table 2 Repo Margining System input data

\ Table 3 Abrahamsson Case Study input data

\ Table 4 Model internal parameters (U(a,b) refers to uniform distribution from a to b, while N(µ,σ) refers to normal distribution with mean µ and standard deviation σ)

\

:::info Authors:

(1) Mohamed Abouelelam, Software System Engineering, University of Regina, Regina, Canada;

(2) Luigi Benedicenti, Software System Engineering, University of Regina, Regina, Canada.

:::


:::info This paper is available on arxiv under CC BY-NC-ND 4.0 DEED license.

:::

\

시장 기회
RealLink 로고
RealLink 가격(REAL)
$0.06465
$0.06465$0.06465
+5.72%
USD
RealLink (REAL) 실시간 가격 차트
면책 조항: 본 사이트에 재게시된 글들은 공개 플랫폼에서 가져온 것으로 정보 제공 목적으로만 제공됩니다. 이는 반드시 MEXC의 견해를 반영하는 것은 아닙니다. 모든 권리는 원저자에게 있습니다. 제3자의 권리를 침해하는 콘텐츠가 있다고 판단될 경우, crypto.news@mexc.com으로 연락하여 삭제 요청을 해주시기 바랍니다. MEXC는 콘텐츠의 정확성, 완전성 또는 시의적절성에 대해 어떠한 보증도 하지 않으며, 제공된 정보에 기반하여 취해진 어떠한 조치에 대해서도 책임을 지지 않습니다. 본 콘텐츠는 금융, 법률 또는 기타 전문적인 조언을 구성하지 않으며, MEXC의 추천이나 보증으로 간주되어서는 안 됩니다.

$30,000 in PRL + 15,000 USDT

$30,000 in PRL + 15,000 USDT$30,000 in PRL + 15,000 USDT

Deposit & trade PRL to boost your rewards!