The post Bitfarms Abandons Bitcoin Mining in Favor of AI Infrastructure appeared on BitcoinEthereumNews.com. Bitcoin miner Bitfarms is abandoning its core business, announcing a full wind-down of all Bitcoin mining operations by 2027 to pivot to AI/HPC infrastructure. The Market Reaction: The stock (BITF) crashed 18% to $2.60 on the news, extending its one-month collapse to over 51%. Bitfarms is now shifting to a “GPU-as-a-Service” model, starting with its 18-megawatt Washington site, as the AI compute market is projected to hit $200B. Bitfarms, once known as one of North America’s most prominent Bitcoin miners, has announced a dramatic shift in strategy, shutting down its Bitcoin mining operations and pivoting fully into high‑performance computing (HPC) and artificial intelligence (AI) infrastructure. The move, revealed alongside its latest earnings report, triggered a sharp sell‑off in the company’s stock, which tanked 18% on Thursday to $2.60, extending a month‑long collapse of more than 51%. A Major Exit From Bitcoin Mining The company confirmed it will wind down all Bitcoin mining activity through 2026 and 2027 after being in the business for nearly a decade. The decision was a result of increasing financial pressures and thin margins across the mining sector. In Q3 2025, Bitfarms reported a net loss of $46 million, nearly double the $24 million loss posted in Q3 2024. Reasons include higher operating costs, reduced miner profitability after the Bitcoin halving, and declining BTC mining rewards. The Washington Site: First Fully Converted AI Facility Bitfarms’ 18‑megawatt site in Washington State will be the company’s flagship HPC/AI data center. Scheduled for completion in December 2026, the facility will feature up to 190 kW per rack, advanced liquid‑cooling systems, and validated designs optimized for Nvidia’s next‑generation GB300 GPUs. NEW: 🚨 Bitfarms PLUNGES 18% after announcing it will shut down #Bitcoin mining and pivot fully into AI data centers starting with a $128M GPU build in Washington. Mining margins… The post Bitfarms Abandons Bitcoin Mining in Favor of AI Infrastructure appeared on BitcoinEthereumNews.com. Bitcoin miner Bitfarms is abandoning its core business, announcing a full wind-down of all Bitcoin mining operations by 2027 to pivot to AI/HPC infrastructure. The Market Reaction: The stock (BITF) crashed 18% to $2.60 on the news, extending its one-month collapse to over 51%. Bitfarms is now shifting to a “GPU-as-a-Service” model, starting with its 18-megawatt Washington site, as the AI compute market is projected to hit $200B. Bitfarms, once known as one of North America’s most prominent Bitcoin miners, has announced a dramatic shift in strategy, shutting down its Bitcoin mining operations and pivoting fully into high‑performance computing (HPC) and artificial intelligence (AI) infrastructure. The move, revealed alongside its latest earnings report, triggered a sharp sell‑off in the company’s stock, which tanked 18% on Thursday to $2.60, extending a month‑long collapse of more than 51%. A Major Exit From Bitcoin Mining The company confirmed it will wind down all Bitcoin mining activity through 2026 and 2027 after being in the business for nearly a decade. The decision was a result of increasing financial pressures and thin margins across the mining sector. In Q3 2025, Bitfarms reported a net loss of $46 million, nearly double the $24 million loss posted in Q3 2024. Reasons include higher operating costs, reduced miner profitability after the Bitcoin halving, and declining BTC mining rewards. The Washington Site: First Fully Converted AI Facility Bitfarms’ 18‑megawatt site in Washington State will be the company’s flagship HPC/AI data center. Scheduled for completion in December 2026, the facility will feature up to 190 kW per rack, advanced liquid‑cooling systems, and validated designs optimized for Nvidia’s next‑generation GB300 GPUs. NEW: 🚨 Bitfarms PLUNGES 18% after announcing it will shut down #Bitcoin mining and pivot fully into AI data centers starting with a $128M GPU build in Washington. Mining margins…

Bitfarms Abandons Bitcoin Mining in Favor of AI Infrastructure

  • Bitcoin miner Bitfarms is abandoning its core business, announcing a full wind-down of all Bitcoin mining operations by 2027 to pivot to AI/HPC infrastructure.
  • The Market Reaction: The stock (BITF) crashed 18% to $2.60 on the news, extending its one-month collapse to over 51%.
  • Bitfarms is now shifting to a “GPU-as-a-Service” model, starting with its 18-megawatt Washington site, as the AI compute market is projected to hit $200B.

Bitfarms, once known as one of North America’s most prominent Bitcoin miners, has announced a dramatic shift in strategy, shutting down its Bitcoin mining operations and pivoting fully into high‑performance computing (HPC) and artificial intelligence (AI) infrastructure.

The move, revealed alongside its latest earnings report, triggered a sharp sell‑off in the company’s stock, which tanked 18% on Thursday to $2.60, extending a month‑long collapse of more than 51%.

A Major Exit From Bitcoin Mining

The company confirmed it will wind down all Bitcoin mining activity through 2026 and 2027 after being in the business for nearly a decade. The decision was a result of increasing financial pressures and thin margins across the mining sector.

In Q3 2025, Bitfarms reported a net loss of $46 million, nearly double the $24 million loss posted in Q3 2024. Reasons include higher operating costs, reduced miner profitability after the Bitcoin halving, and declining BTC mining rewards.

The Washington Site: First Fully Converted AI Facility

Bitfarms’ 18‑megawatt site in Washington State will be the company’s flagship HPC/AI data center. Scheduled for completion in December 2026, the facility will feature up to 190 kW per rack, advanced liquid‑cooling systems, and validated designs optimized for Nvidia’s next‑generation GB300 GPUs.

A newly signed $128 million agreement with a major US infrastructure provider will fund hardware, materials, and buildout. The site is expected to achieve a leading PuE (Power Usage Effectiveness) between 1.2 and 1.3.

Related: du Launches Cloud Miner for UAE Crypto Enthusiasts

The Washington site represents less than 1% of Bitfarms’ massive 2.1 GW portfolio of energized and developable energy assets, but the company believes its GPU‑as‑a‑Service model there could become a foundational revenue engine.

Why AI Instead of Bitcoin?

After the 2024 Bitcoin halving, the cost of mining a single BTC for the company soared to over $48,000. Meanwhile, the AI compute market is exploding, projected to attract more than $200 billion in investment this year alone.

AI training firms, data‑center operators, and enterprise cloud providers are searching for power, cooling, and rack‑dense infrastructure. These are areas where Bitcoin miners dominate. Several miners, including IREN and Core Scientific, have also begun shifting toward AI.

Related: Tether CEO Outlines 2025 Plan: Bitcoin Mining, AI, and US Regulatory Compliance for USDT

Disclaimer: The information presented in this article is for informational and educational purposes only. The article does not constitute financial advice or advice of any kind. Coin Edition is not responsible for any losses incurred as a result of the utilization of content, products, or services mentioned. Readers are advised to exercise caution before taking any action related to the company.

Source: https://coinedition.com/bitfarms-to-wind-down-bitcoin-mining-by-2027-shift-focus-to-ai-infrastructure/

Market Opportunity
Sleepless AI Logo
Sleepless AI Price(AI)
$0.03669
$0.03669$0.03669
+2.80%
USD
Sleepless AI (AI) Live Price Chart
Disclaimer: The articles reposted on this site are sourced from public platforms and are provided for informational purposes only. They do not necessarily reflect the views of MEXC. All rights remain with the original authors. If you believe any content infringes on third-party rights, please contact service@support.mexc.com for removal. MEXC makes no guarantees regarding the accuracy, completeness, or timeliness of the content and is not responsible for any actions taken based on the information provided. The content does not constitute financial, legal, or other professional advice, nor should it be considered a recommendation or endorsement by MEXC.

You May Also Like

Thyroid Eye Disease (TED) Treatments Market Nears $4.3 Billion by 2032: Emerging Small Molecule Therapies Targeting Orbital Fibroblasts Drive Revenue Growth – ResearchAndMarkets.com

Thyroid Eye Disease (TED) Treatments Market Nears $4.3 Billion by 2032: Emerging Small Molecule Therapies Targeting Orbital Fibroblasts Drive Revenue Growth – ResearchAndMarkets.com

DUBLIN–(BUSINESS WIRE)–The “Thyroid Eye Disease Treatments Market – Global Forecast 2025-2032” report has been added to ResearchAndMarkets.com’s offering. The thyroid
Share
AI Journal2025/12/20 04:48
Virtus Equity & Convertible Income Fund Announces Special Year-End Distribution and Discloses Sources of Distribution – Section 19(a) Notice

Virtus Equity & Convertible Income Fund Announces Special Year-End Distribution and Discloses Sources of Distribution – Section 19(a) Notice

HARTFORD, Conn.–(BUSINESS WIRE)–Virtus Equity & Convertible Income Fund (NYSE: NIE) today announced the following special year-end distribution to holders of its
Share
AI Journal2025/12/20 05:30
Fed rate decision September 2025

Fed rate decision September 2025

The post Fed rate decision September 2025 appeared on BitcoinEthereumNews.com. WASHINGTON – The Federal Reserve on Wednesday approved a widely anticipated rate cut and signaled that two more are on the way before the end of the year as concerns intensified over the U.S. labor market. In an 11-to-1 vote signaling less dissent than Wall Street had anticipated, the Federal Open Market Committee lowered its benchmark overnight lending rate by a quarter percentage point. The decision puts the overnight funds rate in a range between 4.00%-4.25%. Newly-installed Governor Stephen Miran was the only policymaker voting against the quarter-point move, instead advocating for a half-point cut. Governors Michelle Bowman and Christopher Waller, looked at for possible additional dissents, both voted for the 25-basis point reduction. All were appointed by President Donald Trump, who has badgered the Fed all summer to cut not merely in its traditional quarter-point moves but to lower the fed funds rate quickly and aggressively. In the post-meeting statement, the committee again characterized economic activity as having “moderated” but added language saying that “job gains have slowed” and noted that inflation “has moved up and remains somewhat elevated.” Lower job growth and higher inflation are in conflict with the Fed’s twin goals of stable prices and full employment.  “Uncertainty about the economic outlook remains elevated” the Fed statement said. “The Committee is attentive to the risks to both sides of its dual mandate and judges that downside risks to employment have risen.” Markets showed mixed reaction to the developments, with the Dow Jones Industrial Average up more than 300 points but the S&P 500 and Nasdaq Composite posting losses. Treasury yields were modestly lower. At his post-meeting news conference, Fed Chair Jerome Powell echoed the concerns about the labor market. “The marked slowing in both the supply of and demand for workers is unusual in this less dynamic…
Share
BitcoinEthereumNews2025/09/18 02:44