Author: rosie , Crypto KOL Compiled by: Felix, PANews Crypto Twitter (CT) always likes to tell you how to launch a token: accumulate 100k followers first, increase engagement through tasks,Author: rosie , Crypto KOL Compiled by: Felix, PANews Crypto Twitter (CT) always likes to tell you how to launch a token: accumulate 100k followers first, increase engagement through tasks,

The truth that crypto KOLs won’t tell you: Four major illusions and data falsifications of new project launches

2025/07/07 16:58
7 min read

Author: rosie , Crypto KOL

Compiled by: Felix, PANews

Crypto Twitter (CT) always likes to tell you how to launch a token: accumulate 100k followers first, increase engagement through tasks, raise funds from Tier 1 VCs, control the circulating supply at 2% at launch, and maximize hype during the week of the Token Generation Event (TGE).

Here’s the thing: it’s all bullshit.

Simplicity Group recently released a research report that analyzed 50,000 data points from 40 major token issuances in 2025. The results showed that the traditional methods promoted on CT do not work in actual token issuance.

The Lie About Engagement

Everyone (even me) is obsessed with Twitter metrics. Likes, retweets, replies, impressions — all those vanity metrics. Projects spend thousands of dollars on engagement farming, tasking platforms, and buying followers.

Correlation with price performance over the week: Almost zero.

Regression analysis by Simplicity Group shows that the correlation coefficient between participation metrics and price performance is only 0.038. In short: participation explains almost nothing about token success.

Likes, comments, and reposts actually have a slight negative correlation with price performance. This means that projects with higher engagement sometimes perform worse. GoPlus, SonicSVM, and RedStone are constantly publishing content, but their user engagement is not proportional to their user base.

The truth that crypto KOLs won’t tell you: Four major illusions and data falsifications of new project launches

The only metric that shows a positive correlation is surprisingly the number of retweets in the week before the post. The p-value is 0.094, barely statistically significant, but even so, the correlation is weak.

Therefore, when you spend money to buy water armies and carefully plan complex task activities, you are actually just burning money "meaninglessly".

The low circulation myth

CT is obsessed with "low circulation, high FDV" projects. The idea is to issue a token with a very small circulating supply, create artificial scarcity, and then watch the price soar.

But it turned out to be wrong again.

Initial circulation as a percentage of total supply has no correlation with price performance. Studies have shown that it does not have any statistically significant correlation at all.

What really matters is: the USD value of the initial market cap.

The R² is 0.273 and the adjusted R² is 0.234, and the relationship between the two is very clear: for every 1 unit increase in the initial market value (IMC), the return rate after one week will decrease by about 1.37 units.

In short: for every 2.7x increase in initial market cap, price performance in the first month drops by about 1.56%. This relationship is so strong that it almost seems causal.

Lesson: It’s not the percentage of tokens unlocked that matters, but the total dollar value entering the market.

The illusion of VC support

“Wow, they raised $100 million from a16z, this is going to skyrocket!”

Narrator: The results did not skyrocket.

The correlation between the amount of financing and the one-week return rate is 0.1186, with a p-value of 0.46. The correlation between the amount of financing and the one-month return rate is 0.2, with a p-value of 0.22.

Neither is statistically significant. There is virtually no relationship between the amount of money a project raises and the performance of its token.

Why? Because more money raised generally means a higher valuation, which means more selling pressure to overcome. Additional funds do not magically translate into a better token.

Yet CT sees financing announcements as buy signals. This is like judging a restaurant by the rent the owner pays.

The truth that crypto KOLs won’t tell you: Four major illusions and data falsifications of new project launches

Perfect example: projects in the study that raised huge amounts of money did not necessarily perform better than projects that raised more limited amounts. A $100 million round does not guarantee a better token economy or a stronger community than a $10 million round.

The hype timing fallacy

Conventional wisdom holds that the most important news should be saved for launch week to maximize FOMO and grab everyone’s attention when the token goes live.

But the data suggests the opposite is true.

After the project is launched, user engagement will decline. Users will move on to the next project with an airdrop, and your carefully prepared content will be ignored.

Projects that perform consistently well build awareness before launch week, not during it. They understand that pre-launch attention brings real buyers, while launch week attention brings “passers-by.” User engagement peaks before the TGE, when they release a preview of the launch, not after the launch, when everyone has moved on to the next opportunity.

A truly effective method

If Twitter engagement, low liquidity, VC backing, and hype timing don’t matter, then what does?

Actual product effectiveness

Projects that naturally generate content, such as Bubblemaps with its on-chain survey functionality or Kaito with its narrative tracking functionality, outperform meme-focused accounts. Bubblemaps and Kaito have large and sustained user engagement because their products naturally create alpha-full content.

Transaction retention rate

Tokens that maintained trading volume after the initial hype had significantly better price performance. The Spearman rank correlation coefficient was -0.356 (p = 0.014 ) - tokens with larger declines in trading volume tended to have worse price performance. One month after issuance, the top quartile of volume retention had significantly higher median and mean price performance .

Reasonable initial market value

The strongest predictor of success. The correlation is -1.56 and is statistically significant. Go public at a reasonable valuation and you have room to grow. Go public at a market cap of $1 billion or more and you’re going against the grain.

Real communication

A consistent tone that matches the product. Powerloom’s $5.2 million raise was at odds with an overly cynical tone — POWER plummeted 77% in its first week and is down 95% since launch. Meanwhile, Walrus tweeted with genuine humor, and a month later the token offering (TGE) price was up 357%. Hyperlane stuck to a matter-of-fact update and surged 533% in its first week.

Why did CT go wrong?

This disconnect is not malicious, it is structural.

CT rewards engagement, not accuracy. A post about “10 ways to 100x your token launch” gets more retweets than “what the data actually shows”.

KOLs accumulate fans by "catering" to projects instead of challenging them. Telling users that their engagement farming is meaningless and will not bring returns.

In addition, most KOLs on CT have never actually issued a token. They are just reviewing a game they have never played. And projects like Story Protocol that have actually launched a product continue to perform well, regardless of the number of Twitter followers.

True Meta

Here’s what successful projects actually do (based on data):

  • Focus on building products people want to use
  • Reasonable pricing at token launch
  • Communicate sincerely with your audience
  • Measure what really matters, not the number of likes

This is absolutely revolutionary stuff.

Take Quai Network for example - they focus on technical explanations and educational posts about their unique blockchain consensus model. During the TGE, the average pageview was about 24k. QUAI rose 150% in the first week after launch. This is not because they have millions of followers, but because they have truly sparked interest in their innovation.

In contrast, projects that burned money on task platforms and participatory marketing saw their tokens plummet because no one really understood or cared about what they were building.

The irony is that while everyone is catering to the Twitter algorithm, the projects that are really succeeding are those that are quietly building useful things and releasing them wisely.

Case study: Zora’s failure to disclose token economics details in a timely manner led to a 50% plunge a week after its TGE. Meanwhile, projects that are transparent in their approach and focus on product-driven content have consistently outperformed.

CT doesn’t mean to lie. But when incentives reward popular opinions rather than hard data, useful information gets lost in the noise.

Related reading: The influence economy of crypto Twitter: How a small number of accounts control the narrative

Market Opportunity
Threshold Logo
Threshold Price(T)
$0.007612
$0.007612$0.007612
-1.25%
USD
Threshold (T) Live Price Chart
Disclaimer: The articles reposted on this site are sourced from public platforms and are provided for informational purposes only. They do not necessarily reflect the views of MEXC. All rights remain with the original authors. If you believe any content infringes on third-party rights, please contact service@support.mexc.com for removal. MEXC makes no guarantees regarding the accuracy, completeness, or timeliness of the content and is not responsible for any actions taken based on the information provided. The content does not constitute financial, legal, or other professional advice, nor should it be considered a recommendation or endorsement by MEXC.

You May Also Like

Trading time: Tonight, the US GDP and the upcoming non-farm data will become the market focus. Institutions are bullish on BTC to $120,000 in the second quarter.

Trading time: Tonight, the US GDP and the upcoming non-farm data will become the market focus. Institutions are bullish on BTC to $120,000 in the second quarter.

Daily market key data review and trend analysis, produced by PANews.
Share
PANews2025/04/30 13:50
Ethereum Fusaka Upgrade Set for December 3 Mainnet Launch, Blob Capacity to Double

Ethereum Fusaka Upgrade Set for December 3 Mainnet Launch, Blob Capacity to Double

Ethereum developers confirmed the Fusaka upgrade will activate on mainnet on December 3, 2025, following a systematic testnet rollout beginning on October 1 on Holesky. The major hard fork will implement around 11-12 Ethereum Improvement Proposals targeting scalability, node efficiency, and data availability improvements without adding new user-facing features. According to Christine Kim, the upgrade introduces a phased blob capacity expansion through Blob Parameter Only forks occurring two weeks after Fusaka activation. Initially maintaining current blob limits of 6/9 target/max, the first BPO fork will increase capacity to 10/15 blobs one week later. A second BPO fork will further expand limits to 14/21 blobs, more than doubling total capacity within two weeks. Strategic Infrastructure Overhaul Fusaka prioritizes backend protocol improvements over user-facing features, focusing on making Ethereum faster and less resource-intensive. The upgrade includes PeerDAS implementation through EIP-7594, allowing validator nodes to verify data by sampling small pieces rather than downloading entire blobs. This reduces bandwidth and storage requirements while enhancing Layer 2 rollup scalability. The upgrade builds on recent gas limit increases from 30 million to 45 million gas, with ongoing discussions for further expansion. EIP-7935 proposes increasing limits to 150 million gas, potentially enabling significantly higher transaction throughput. These improvements complement broader scalability efforts, including EIP-9698, which suggests a 100x gas limit increase over two years to reach 2,000 transactions per second. Fusaka removes the previously planned EVM Object Format redesign to reduce complexity while maintaining focus on essential infrastructure improvements. The upgrade introduces bounded base fees for blob transactions via EIP-7918, creating more predictable transaction costs for data-heavy applications. Enhanced spam resistance and security improvements strengthen network resilience against scalability bottlenecks and attacks. Technical Implementation and Testing Timeline The Fusaka rollout follows a conservative four-phase approach across Ethereum testnets before mainnet deployment. Holesky upgrade occurs October 1, followed by Sepolia on October 14 and Hoodi on October 28. Each testnet will undergo the complete BPO fork sequence to validate the blob capacity expansion mechanism. BPO forks activate automatically based on predetermined epochs rather than requiring separate hard fork processes. On mainnet, the first BPO fork launches December 17, increasing blob capacity to 10/15 target/max. The second BPO fork activates January 7, 2026, reaching the final capacity of 14/21 blobs. This automated approach enables flexible blob scaling without requiring full network upgrades. Notably, node operators face release deadlines ranging from September 25 for Holesky to November 3 for mainnet preparation. The staggered timeline, according to the developers, allows comprehensive testing while giving infrastructure providers sufficient preparation time. Speculatively, the developers use this backward-compatible approach to ensure smooth transitions with minimal disruption to existing applications. PeerDAS implementation reduces node resource demands, potentially increasing network decentralization by lowering barriers for smaller operators. The technology enables more efficient data availability sampling, crucial for supporting growing Layer 2 rollup adoption. Overall, these improvements, combined with increased gas limits, will enable Ethereum to handle higher transaction volumes while maintaining security guarantees. Addressing Network Scalability Pressures The Fusaka upgrade addresses mounting pressure for Ethereum base layer improvements amid criticism of Layer 2 fragmentation strategies. Critics argue that reliance on rollups has created isolated chains with limited interoperability, complicating user experiences. The upgrade’s focus on infrastructure improvements aims to enhance base layer capacity while supporting continued Layer 2 growth. The recent validator queue controversy particularly highlights ongoing network scalability challenges. According to a Cryptonews report covered yesterday, currently, over 2M ETH sits in exit queues facing 43-day delays, while entry queues process in just 7 days.Ethereum Validator Queue (Source: ValidatorQueue) However, Vitalik Buterin defended these delays as essential for network security, comparing validator commitments to military service requiring “friction in quitting.” The upgrade coincides with growing institutional interest in Ethereum infrastructure, with VanEck predicting that Layer 2 networks could reach $1 trillion market capitalization within six years. Fusaka’s emphasis on data availability and node efficiency supports Ethereum’s evolution toward seamless cross-chain interoperability. The upgrade complements initiatives like the Open Intents Framework, where Coinbase Payments recently joined as a core contributor. The initiative, if successful, will address the $21B surge in cross-chain crime. These coordinated efforts aim to unify the fragmented multichain experience while maintaining Ethereum’s security and decentralization principles
Share
CryptoNews2025/09/19 16:37
VectorUSA Achieves Fortinet’s Engage Preferred Services Partner Designation

VectorUSA Achieves Fortinet’s Engage Preferred Services Partner Designation

TORRANCE, Calif., Feb. 3, 2026 /PRNewswire/ — VectorUSA, a trusted technology solutions provider, specializes in delivering integrated IT, security, and infrastructure
Share
AI Journal2026/02/05 00:02