The post Paraguay Bitcoin Mining Boom Tests 100% Green Energy Capacity appeared on BitcoinEthereumNews.com. HIVE Digital Technologies recently completed a major expansion of its hydro-powered mining facility in Paraguay The company reports it now contributes over 24 EH/s (exahash per second) to the global Bitcoin network and has generated 289 BTC in October alone Paraguayan Industrial Union (UIP) has warned that if mining demand continues rising unchecked, the country’s power grid could collapse as early as 2029 HIVE Digital Technologies, one of the largest Bitcoin miners globally, recently completed a major expansion of its hydro-powered mining facility in Paraguay, bringing the site’s total capacity to 300 MW. The company reports it now contributes over 24 EH/s (exahash per second) to the global Bitcoin network and has generated 289 BTC in October alone. It also posted its highest-ever quarterly earnings at $87.3 million, which is nearly quadruple last year’s figure, with its growth in Paraguay and increased mining power being the main drivers. Management now states that the business is on track to generate close to $400 million a year from Bitcoin mining, keeping about 50 cents of every dollar in profit after paying for electricity. Related: Bitcoin Miners Face Crackdown After Stealing US$1B in Electricity From Malaysia’s Grid HIVE’s Yguazú mine draws electricity from the massive Itaipú Dam hydroelectric plant, giving it access to clean and cheap energy, which is a big part of Paraguay’s appeal to crypto miners. In fact, crypto mining in the country currently operates under a legal framework that treats it as an industrial activity.  Because Paraguay is growing so fast and runs mostly on clean hydropower, it’s getting a reputation as a green crypto mining haven for Bitcoin miners. As such, the country is now pulling in big investments from abroad and turning into a key spot for global mining operations. The hidden costs However, not all locals share… The post Paraguay Bitcoin Mining Boom Tests 100% Green Energy Capacity appeared on BitcoinEthereumNews.com. HIVE Digital Technologies recently completed a major expansion of its hydro-powered mining facility in Paraguay The company reports it now contributes over 24 EH/s (exahash per second) to the global Bitcoin network and has generated 289 BTC in October alone Paraguayan Industrial Union (UIP) has warned that if mining demand continues rising unchecked, the country’s power grid could collapse as early as 2029 HIVE Digital Technologies, one of the largest Bitcoin miners globally, recently completed a major expansion of its hydro-powered mining facility in Paraguay, bringing the site’s total capacity to 300 MW. The company reports it now contributes over 24 EH/s (exahash per second) to the global Bitcoin network and has generated 289 BTC in October alone. It also posted its highest-ever quarterly earnings at $87.3 million, which is nearly quadruple last year’s figure, with its growth in Paraguay and increased mining power being the main drivers. Management now states that the business is on track to generate close to $400 million a year from Bitcoin mining, keeping about 50 cents of every dollar in profit after paying for electricity. Related: Bitcoin Miners Face Crackdown After Stealing US$1B in Electricity From Malaysia’s Grid HIVE’s Yguazú mine draws electricity from the massive Itaipú Dam hydroelectric plant, giving it access to clean and cheap energy, which is a big part of Paraguay’s appeal to crypto miners. In fact, crypto mining in the country currently operates under a legal framework that treats it as an industrial activity.  Because Paraguay is growing so fast and runs mostly on clean hydropower, it’s getting a reputation as a green crypto mining haven for Bitcoin miners. As such, the country is now pulling in big investments from abroad and turning into a key spot for global mining operations. The hidden costs However, not all locals share…

Paraguay Bitcoin Mining Boom Tests 100% Green Energy Capacity

2025/12/06 05:23
  • HIVE Digital Technologies recently completed a major expansion of its hydro-powered mining facility in Paraguay
  • The company reports it now contributes over 24 EH/s (exahash per second) to the global Bitcoin network and has generated 289 BTC in October alone
  • Paraguayan Industrial Union (UIP) has warned that if mining demand continues rising unchecked, the country’s power grid could collapse as early as 2029

HIVE Digital Technologies, one of the largest Bitcoin miners globally, recently completed a major expansion of its hydro-powered mining facility in Paraguay, bringing the site’s total capacity to 300 MW.

The company reports it now contributes over 24 EH/s (exahash per second) to the global Bitcoin network and has generated 289 BTC in October alone. It also posted its highest-ever quarterly earnings at $87.3 million, which is nearly quadruple last year’s figure, with its growth in Paraguay and increased mining power being the main drivers.

Management now states that the business is on track to generate close to $400 million a year from Bitcoin mining, keeping about 50 cents of every dollar in profit after paying for electricity.

Related: Bitcoin Miners Face Crackdown After Stealing US$1B in Electricity From Malaysia’s Grid

HIVE’s Yguazú mine draws electricity from the massive Itaipú Dam hydroelectric plant, giving it access to clean and cheap energy, which is a big part of Paraguay’s appeal to crypto miners. In fact, crypto mining in the country currently operates under a legal framework that treats it as an industrial activity. 

Because Paraguay is growing so fast and runs mostly on clean hydropower, it’s getting a reputation as a green crypto mining haven for Bitcoin miners. As such, the country is now pulling in big investments from abroad and turning into a key spot for global mining operations.

The hidden costs

However, not all locals share the optimism. For instance, a community in Villarrica (in the Guairá Department) rebelled against a crypto farm operated by Bitfarms. 

For six months in 2024, residents suffered from constant noise (industrial-scale cooling fans ran day and night), causing insomnia, anxiety, and stress-related health problems.

The ‘2029 Collapse’ Scenario

On top of that, the Paraguayan Industrial Union (UIP) has warned that if mining demand continues rising unchecked, Paraguay’s power grid could collapse as early as 2029. This warning links the country’s potential infrastructure failure directly to unregulated crypto mining expansion.

At the same time, HIVE’s push for growth goes hand-in-hand with its focus on clean energy, showing how large-scale crypto mining can be done with an eye on environmental impact. The company’s leadership positions this model as a more responsible alternative to operations predominantly reliant on fossil fuels.

Disclaimer: The information presented in this article is for informational and educational purposes only. The article does not constitute financial advice or advice of any kind. Coin Edition is not responsible for any losses incurred as a result of the utilization of content, products, or services mentioned. Readers are advised to exercise caution before taking any action related to the company.

Source: https://coinedition.com/paraguay-bitcoin-mining-green-energy-capacity-risk/

Disclaimer: The articles reposted on this site are sourced from public platforms and are provided for informational purposes only. They do not necessarily reflect the views of MEXC. All rights remain with the original authors. If you believe any content infringes on third-party rights, please contact service@support.mexc.com for removal. MEXC makes no guarantees regarding the accuracy, completeness, or timeliness of the content and is not responsible for any actions taken based on the information provided. The content does not constitute financial, legal, or other professional advice, nor should it be considered a recommendation or endorsement by MEXC.

You May Also Like

Litecoin Fluctuates Below The $116 Threshold

Litecoin Fluctuates Below The $116 Threshold

The post Litecoin Fluctuates Below The $116 Threshold appeared on BitcoinEthereumNews.com. Sep 17, 2025 at 23:05 // Price Litecoin price analysis by Coinidol.com: LTC price has slipped below the moving average lines after hitting resistance at $120. Litecoin price long-term prediction: bearish The 21-day SMA support helped to alleviate the selling pressure. In other words, the price of the cryptocurrency is above the 21-day SMA support but below the 50-day SMA barrier. This suggests that Litecoin will be trapped in a narrow range for a few days. If the 21-day SMA support or the 50-day SMA barrier is overreached, the cryptocurrency will trend upwards. For example, if the LTC price breaks through the 50-day SMA barrier, it will rise to a high of $124. Litecoin will fall to its current support level of $106 if the 21-day SMA support is broken. Technical Indicators  Resistance Levels: $100, $120, $140 Support Levels: $60, $40, $20 LTC price indicators analysis Litecoin’s price is squeezed between the moving average lines. It is unclear in which direction Litecoin will move. The moving average lines are horizontal in both charts. However, the price bars are limited to the distance between the moving averages. The price bars on the 4-hour chart are below the moving average lines. LTC/USD price chart – September 17, 2025 What is the next move for LTC? On the 4-hour chart, Litecoin is currently trading in a bearish trend zone. The altcoin is trading above the $112 support and below the moving average lines, which represent resistance at $116. The upward movement is hindered by the moving average lines, which are causing the price to oscillate within a limited range. Meanwhile, the signal for the cryptocurrency is bearish, with price bars below the moving average…
Share
BitcoinEthereumNews2025/09/18 08:15