Power BI’s one-app-per-workspace limitation forced teams to duplicate workspaces just to preserve historical snapshots. Org Apps finally separate snapshot distributionPower BI’s one-app-per-workspace limitation forced teams to duplicate workspaces just to preserve historical snapshots. Org Apps finally separate snapshot distribution

How BI Snapshots Turned Our Workspaces Into Time Capsules - Until Org Apps Fixed It

This story is specific to Power BI in Microsoft Fabric, and to a real architectural limitation that shaped how snapshot reporting had to be designed.


The Problem Didn’t Start as a Problem

As a Lead BI Engineer, I didn’t wake up one day and decide to create chaos.

It started innocently.

No problem.

Power BI allowed one app per workspace, so the solution seemed obvious:

  • Clone the workspace.
  • Clone the Semantic Model.
  • Clone the Reports.
  • Freeze it.
  • Publish a separate app.

That was year one.

At the time, this felt like discipline.


Then Year Two Happened

The next year, the same request came in.

So we did it again:

  • New workspace.
  • Same reports.
  • Same semantic logic.
  • Slightly different filters.
  • Another app.

Still manageable. Still defensible.

Still wrong - We just didn’t know it yet.

This was copying, not designing.


When Workspaces Became a Time Dimension

By year three, something subtle had happened.

Workspaces were no longer environments.

They had become time containers:

  • FY23 Workspace.
  • FY24 Workspace.
  • FY25 Workspace.

Each one contained:

  • The same reports.
  • The same visuals.
  • Slightly different logic.
  • Slightly different data cutoffs.

We weren’t versioning reports.

We were forking reality by year.

This was brittleness setting in.


The Workspaces Kept Growing - the Logic Didn’t

Here’s the important part.

Nothing inside those workspaces was meaningfully different.

  • Same DAX
  • Same dimensions
  • Same measures
  • Same layouts

The only difference was time.

And time was being modeled as infrastructure.

We felt that truth daily.


The Operational Weight Nobody Anticipated

Each new snapshot workspace meant:

  • Another place to manage access.
  • Another app link users could bookmark.
  • Another artifact to document.
  • Another explanation during onboarding.

Users didn’t say: “I need the FY24 snapshot.”

They said:

“I opened the report and the numbers look different.”

Now we had to ask:

“Which workspace did you open?”

That line hit uncomfortably close.


The Architecture Was Doing Too Much Work

Workspaces were never meant to answer:

  • Is this mutable?
  • Is this frozen?
  • Is this historical?

But we forced them to.

We turned infrastructure into a proxy for governance semantics.

Inference is fragile. Contracts are not.


The Constraint That Made This Inevitable

All of this traced back to one limitation:

One workspace could publish only one app.

That meant a workspace had to choose:

  • Be current.
  • Or be frozen.

There was no way to say:

So we encoded guarantees into duplication.

We were living proof.


What Changed with Org Apps

When Org Apps became available in Microsoft Fabric, the announcement sounded small: Multiple apps per workspace.

But architecturally, it was the missing piece.

Because now a workspace no longer had to represent time.

Now the model became:

  • One workspace.
  • Owns reports.
  • Owns semantics.
  • Evolves intentionally.
  • Multiple Org Apps.
  • FY24 Snapshot (Immutable).
  • FY25 Snapshot (Immutable).
  • Current View (Live).

Same reports. \n Same logic. \n Different contracts.

Separation of concerns is the foundation of scalable systems - Herbert Simon.

This was separation finally done right.


Why This Was the Missing Piece

Snapshots are not a reporting problem.

They are a distribution problem.

Org Apps let us express:

  • What can change
  • What must not
  • Without duplicating infrastructure

Snapshots stopped being places. \n They became explicit promises.


The Lesson This Took Years to Learn

We didn’t have a snapshot strategy problem.

We had a platform that forced: Immutability to look like duplication.

Org Apps didn’t add convenience.

They corrected a modeling error that enterprise BI teams had been compensating for quietly.


Final Thought

If you’ve never had to preserve a report exactly as it was five years ago, this may sound academic.

If you have - you already understand the relief.

Org Apps didn’t make BI easier.

They made it honest.

And once snapshots stop pretending to be infrastructure, everything else finally gets lighter.

\

Market Opportunity
Power Protocol Logo
Power Protocol Price(POWER)
$0.14459
$0.14459$0.14459
+3.04%
USD
Power Protocol (POWER) Live Price Chart
Disclaimer: The articles reposted on this site are sourced from public platforms and are provided for informational purposes only. They do not necessarily reflect the views of MEXC. All rights remain with the original authors. If you believe any content infringes on third-party rights, please contact service@support.mexc.com for removal. MEXC makes no guarantees regarding the accuracy, completeness, or timeliness of the content and is not responsible for any actions taken based on the information provided. The content does not constitute financial, legal, or other professional advice, nor should it be considered a recommendation or endorsement by MEXC.